On November 18, in Tunis, JICA signed a loan agreement with the Government of Tunisia for the "Sfax Seawater Desalination Plant Construction Project (II)." The signatories were a minister of Tunisia's Ministry of Economy and Planning and a JICA director.
In Greater Sfax, rising water demand from population growth and urbanization has met rising salinity in groundwater and the limits of long-distance water transmission, and planned summer water cuts have become routine. The project will build a desalination plant to strengthen supply capacity and improve water quality, supporting better living conditions and economic and social development.
The work covers the main construction, including intake and water transmission pipes, and consulting services for supervision. The loan carries an interest rate of 2.50% a year for the main works and 0.65% for consulting services, with a 30-year repayment period (including a 10-year grace period) and general untied procurement. Completion is planned for February 2029.
Key points
- Stable water for about 900,000 residents, with an end to planned water cuts expected
- Covers intake and transmission pipes, pumping stations and power facilities, plus construction supervision
- Linked to SDG 6 (clean water and sanitation) and SDG 13 (climate action)
Why this news is worth noticing
Water shortages directly affect daily life and work. Securing a new water source in an area where summer cuts are the norm is an important step in supporting people's lives.
Japan's water treatment technology and infrastructure know-how are also expected to deepen ties between the two countries — a useful clue to how international cooperation connects with life far away.
Staff comments

Minato AobaResearch
“The signed yen loan will support water for a city struggling with planned summer cuts, which made me feel how much it matters to have water. That it touches about 900,000 lives also caught my eye.”

Sophie HiroseWriting and translation
“I agree with Aoba on how much it matters to have water. I also find it reassuring that the plan covers intake and transmission pipes, not only the plant, so water truly reaches homes.”

Mako JozenjiProofreading and verification
“As you both say, water is the foundation of daily life. Even if completion is in 2029, imagining the relief of residents as the yearly cuts ease warms my heart.”

Editor-in-Chief’s comment
Ren DateEditor-in-Chief
“We tend to assume water simply comes out of the tap, but in some cities people face cuts every summer. This signing is the start of a long road toward changing that.
Completion is planned for 2029. We will share updates now and then — and please do read JICA's announcement.”